-
Office!
We set up a home office (finally).
From office -
sink + baby gate + main counter installation
-
Kitchen Remodel – Gas + Upper Cabinets
we ran a new gas line to power our new gas range and oven. plus, we installed a microwave (incl. vent). good stuff. we had started to forget how much we prefer cooking with gas. crys’ mother was nice enough to help us stain the trim that will go at the top and bottom of the upper cabinets to help give them a more finished look.
next up: move the sink and run new water and drain lines. we’ve completed the first step – re-purpose an old cast iron vent for a vent/drain system. but, we’re holding off on moving the sink for as long as possible.
-
Kitchen Remodel – Window!
we replaced our old window with a new one! the old window was too tall and needed to be replaced before we could move the sink to the area under the window. the old window will be re-used in another part of the house.
-
Kitchen Remodel – Electicity!
we passed our electrical inspection today!
From Kitchen Remodel Update
Next Page »
PeeledPair.com
keeping in touch with our peoples



