-
Kitchen Remodel – Window!
we replaced our old window with a new one! the old window was too tall and needed to be replaced before we could move the sink to the area under the window. the old window will be re-used in another part of the house.
-
Kitchen Remodel – Electicity!
we passed our electrical inspection today!
From Kitchen Remodel Update -
Kitchen Remodel – Cabinets
our cabinets arrived this week. crys took about 5 minutes to assemble each unit. amazing.
-
Kitchen Remodel – Countertop and Cabinet
here are samples of our new cabinet and countertop tiles…

From Kitchen Remodel – Countertop and Cabinet -
Kitchen Remodel – Sink and Faucet
our new kitchen sink and faucet arrived this week:
Next Page »« Previous Page
PeeledPair.com
keeping in touch with our peoples



