-
Kitchen Remodel – Gas + Upper Cabinets
Posted on July 19th, 2009 No commentswe ran a new gas line to power our new gas range and oven. plus, we installed a microwave (incl. vent). good stuff. we had started to forget how much we prefer cooking with gas. crys’ mother was nice enough to help us stain the trim that will go at the top and bottom of the upper cabinets to help give them a more finished look.
next up: move the sink and run new water and drain lines. we’ve completed the first step – re-purpose an old cast iron vent for a vent/drain system. but, we’re holding off on moving the sink for as long as possible.
Leave a Reply
PeeledPair.com
keeping in touch with our peoples



