<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Kitchen Remodel &#8211; Cabinets</title>
	<atom:link href="http://peeledpair.com/2009/05/kitchen-remodel-cabinets/feed/" rel="self" type="application/rss+xml" />
	<link>http://peeledpair.com/2009/05/kitchen-remodel-cabinets/</link>
	<description>keeping in touch with our peoples</description>
	<lastBuildDate>Thu, 24 Jun 2010 23:45:52 -0700</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.6</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Mark</title>
		<link>http://peeledpair.com/2009/05/kitchen-remodel-cabinets/comment-page-1/#comment-28</link>
		<dc:creator>Mark</dc:creator>
		<pubDate>Mon, 25 May 2009 21:54:18 +0000</pubDate>
		<guid isPermaLink="false">http://peeledpair.com/?p=165#comment-28</guid>
		<description>our goal is to finish by the end of june... one week for electrical, four days for plumbing (gas + water), one day to repair the floor, one week to shrink the window, one day to paint, one week to install the cabinets, one week to install the countertops and the sink, two days to install appliances (7+4+1+7+1+1+7+7+2=37 days=end by june 30). 

but, we&#039;ll see... i hear these things never go as planned...</description>
		<content:encoded><![CDATA[<p>our goal is to finish by the end of june&#8230; one week for electrical, four days for plumbing (gas + water), one day to repair the floor, one week to shrink the window, one day to paint, one week to install the cabinets, one week to install the countertops and the sink, two days to install appliances (7+4+1+7+1+1+7+7+2=37 days=end by june 30). </p>
<p>but, we&#8217;ll see&#8230; i hear these things never go as planned&#8230;</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: brian</title>
		<link>http://peeledpair.com/2009/05/kitchen-remodel-cabinets/comment-page-1/#comment-27</link>
		<dc:creator>brian</dc:creator>
		<pubDate>Mon, 25 May 2009 21:33:47 +0000</pubDate>
		<guid isPermaLink="false">http://peeledpair.com/?p=165#comment-27</guid>
		<description>Now you need to post photos of them installed...</description>
		<content:encoded><![CDATA[<p>Now you need to post photos of them installed&#8230;</p>
]]></content:encoded>
	</item>
</channel>
</rss>